Laserfiche WebLink
0 0 <br />BOOK 8 PAGE 4 4 7 <br />SECTION 2-5, INSPECTION PROCEDURE, <br />(A) INSPECTIONS, THE INSPECTION DEPARTMENT SHALL INSPECT <br />ALL BUILDINGS AND STRUCTURES AND WORK THEREIN FOR WHICH <br />A PERMIT OF ANY KIND HAS BEEN ISSUED AS OFTEN AS <br />NECESSARY IN ORDER TO DETERMINE WHETHER THE WORK <br />COMPLIES WITH THIS ORDINANCE AND THE APPROPRIATE CODES, <br />WHEN DEEMED NECESSARY BY HE APPROPRIATE INSPECTOR, <br />MATERIALS AND ASSEMBLIES MAY BE INSPECTED AT THE POINT <br />OF MANUFACTURE OR FABRICATION, OR INSPECTIONS MAY BE <br />MADE BY APPROVED AND RECOGNIZED INSPECTION ORGANIZATIONS; <br />PROVIDED, NO APPROVAL SHALL BE BASED UPON REPORTS OF <br />SUCH ORGANIZATIONS UNLESS THE SAME ARE IN WRITING AND <br />CERTIFIED BY A RESPONSIBLE OFFICER OF SUCH ORGANIZATION, <br />ALL HOLDERS OF PERMITS, OR THEIR AGENTS, SHALL <br />NOTIFY THE INSPECTION DEPARTMENT AND THE APPROPRIATE <br />INSPECTOR AT EACH OF THE FOLLOWING STAGES OF CONSTRUCTION <br />SO THAT APPROVAL. MAY BE GIVEN BEFORE WORK IS CONTINUED: <br />(1) FOUNDATION INSPECTION, TO BE MADE AFTER TRENCHES <br />ARE EXCAVATED AND THE NECESSARY REINFORCEMENT AND <br />FORMS ARE IN PLACE, AND BEFORE CONCRETE IS PLACED, <br />DRILLED FOOTINGS, PILES, AND SIMILAR TYPES OF <br />FOUNDATIONS SHALL BE INSPECTED AS INSTALLED, <br />(2) FRAMING INSPECTION, TO BE MADE AFTER ALL STRUCTURAL <br />FRAMING IS IN PLACE AND ALL ROUGHING-IN OF PLUMBING <br />AND ELECTRICAL AND HEATING HAS BEEN INSTALLED, AFTER <br />ALL FIRE BLOCKING, CHIMNEYS, BRACING AND VENTS ARE <br />INSTALLED, BUT BEFORE ANY OF THE STRUCTURE IS ENCLOSED <br />OR COVERED, POURED IN PLACE CONCRETE STRUCTURAL <br />ELEMENTS SHALL BE INSPECTED BEFORE EACH POUR OF ANY <br />STRUCTURAL MEMBER, <br />-6- <br />