My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda - 5-22-14 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2014
>
Agenda - 5-22-14 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2014 7:59:28 AM
Creation date
5/16/2014 7:57:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HALE ARTIFICIER, INC. <br />Safety Procedures for Fireworks Displays <br />NFPA 1123 Codes are to be followed at all times. <br />1. Firing Procedure: <br />A. Operators are to use the Pre - display checklist provided in the display paper- <br />work. AT NO TIME are the materials to be left unattended. <br />B. Upon arrival at the site, check site conditions for any hazards that may impede <br />the safety of the display operation. <br />C. Insure the site meets all distance requirements. <br />D. Confirm that there is adequate ingress and egress for emergency vehicles. <br />E. Inspect all racks and equipment as it is coming off the truck. Any equipment <br />that is damaged, or broken is not to be used in the display. <br />F. All mortar racks are to be set up and installed prior to any loading of live ma- <br />terials. <br />G. Inspect all shells and fireworks devices such as cakes, candles, and ground ef- <br />fects prior to loading, or placing in the firing area. Any materials found to be <br />damaged, or not in proper condition are not to be used in the display. <br />H. All materials fuses are to be situated and secured for easy access and removal of <br />safety caps just prior to firing <br />I. (Electric firing) Any e- matching of materials will take place at least 50 feet from <br />the truck holding the fireworks, and at least 100 feet from any public access. <br />Limit the amount of materials in this area to just ONE box at a time. <br />J. (Electric firing) Once all materials are set up, no personnel are allowed within <br />the firing area during the continuity testing If there is a need to check contact <br />points, or adjust materials, the firing control panel must be disabled completely <br />before an operator enters the firing area. <br />K. (Manual Firing) Operators will use fusees (flares) for ignition of shell leaders. <br />L. Previously installed multiple ignition points are to be placed along Finale racks, <br />or any chain fused sections of the display. <br />545 NEW BOWERS ROAD, LEXINGTON, NC 27292 <br />W W W. HALEARTFI REWORKS. COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.