My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 2--10-14 Jt. Meeting with CCCC Bd of Trustees
public access
>
Clerk
>
MINUTES
>
2014
>
Minutes - 2--10-14 Jt. Meeting with CCCC Bd of Trustees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2014 8:04:53 AM
Creation date
3/25/2014 8:04:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B K 00026 PG <br />Justification: <br />• During 2011, a committee was established to determine how the facility could continue to serve Lee <br />County citizens over the next 20 years and beyond. The committee identified safety problems and the <br />need for additional conference space to increase facility rental opportunities. <br />Total projected cost: $4 million <br />Priority 4 <br />Repair and Renovation: Sanford (Main) Campus, Emergency Services Training Center <br />Details: <br />• This project would include a variety of repair projects around campus and the renovation funds to <br />repurpose spaces as new buildings are opened. <br />Justification: <br />• The Registrar's Office could join other student services functions due to bookstore relocation. <br />• Joyner Hall roof would be replaced. <br />• Critically- needed expansion of the welding program would occur at the Sanford Campus or the <br />Innovation Center. <br />• Emergency Services Training Center renovations would include an indoor physical training area with <br />shower and locker room facilities, non - lethal training ammunition firearms training areas, installation of a <br />security chain link fence around the area, and improvements to the driving track. <br />Total projected cost: $4 million <br />Priority 5 <br />Renovation: Business Incubator <br />Details: <br />• Renovation of a building (located on 130 Steele Street, Sanford), including roof replacement <br />Total projected cost: $1 million <br />Total cost of all projects: $ 23 million <br />NORTH CAROUNA LEE COUW <br />Presented for reg on on this 1 ` day <br />of M &- 20, l_4 at 00 ata�s <br />recorded in Book _a G _ Page 3:s J <br />Mollie A Mcinnls„ Register of Deeds <br />f <br />CEfwl RAL <br />CARCA INA <br />
The URL can be used to link to this page
Your browser does not support the video tag.