My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Package - 06-15-09
public access
>
Clerk
>
AGENDA PACKAGES
>
2009
>
Agenda Package - 06-15-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2009 3:42:52 PM
Creation date
10/28/2009 3:27:19 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Agenda
Committee
Board of Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
091 <br />BUILDING PERMIT FEES <br />COMMERCIAL <br />C, <br />COMMERCIAL <br />ew <br />50,000 Square Feet and Less. <br />Building Permit Fee: <br />Estimated Cost of Construction shall be determined by multiplying the total gross building <br />square footage by the cost per square foot for Type of Occupancy listed below; <br />Permit Fee = Estimated Cost of Construction from above divided b $1,000, multiplied b $2 <br />Assembl <br />$80 <br />Business <br />$70 <br />Educational <br />$80 <br />Facto /industrial <br />$80 <br />Hazardous <br />$80 <br />Institutional <br />$100 <br />Mercantile <br />$80 <br />Residential <br />$80 <br />Storage <br />$40 Heated <br />$35 Unheated <br />Utility and Miscellaneous <br />$40 Heated <br />$35 Unheated <br />Mixed Occu an <br />Highest Cost per S .Ft of Occu an T es <br />COMMERCIAL <br />50,000 Square Feet and More. <br />(New) <br />uilding Permit Fee: <br />Estimated Cost of Construction shall be determined by: <br />1. Multiplying the first 50,000 square feet of the total building gross square footage by <br />the cost per square foot for Type of Occupancy listed below. <br />2. Multiplying the square footage in excess of 50,000 square feet by the cost per square <br />foot for Type of Occupancy listed below and add to figure from above. <br />Permit Fee = Estimated Cost of Construction (from 1 above), divided by $1,000, <br />multiplied by $2 <br />Plus <br />Estimated Cost of Construction from 2 above), divided b $1,000, multi lied b $1. <br />Assembly <br />$80 <br />Business <br />$70 <br />Educational <br />$80 <br />Facto /Industrial <br />$80 <br />Hazardous <br />$80 <br />Institutional <br />$100 <br />Mercantile <br />$80 <br />Residential <br />$80 <br />Storage <br />$40 Heated <br />$35 Unheated <br />Utility and Miscellaneous <br />$40 Heated <br />$35 Unheated <br />Mixed Occupancy <br />Highest Cost per S9-Ft- of Occu an Types <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.