Laserfiche WebLink
BUILDING PERMIT FEES <br />RESIDENTIAL <br />I <br />090 <br />RESIDENTIAL <br />(New) <br />Includes all Single Family Dwellings, Duplexes, and Townhouses. <br />Square Footage u to 1500 s .ft.: $190 Basic Fee. <br />Building Permit Fee: <br />Square Footage over 1500 s .ft: Multiply b $0.15 + $190.00 Basic Fee <br />North Carolina Licensed General Contractors add $10.00 Homeowner Recovery <br />Fund. G.S.§ 87-15.6). <br />RESIDENTIAL <br />Additional permits shall be obtained for porches, basements, garages and additional <br />(Modular Homes) <br />structural alterations to the modular home in accordance with the appropriate fee <br />schedule. Please be aware that separate permits are required for electrical, mechanical <br />and plumbing. <br />In accordance with GS.§ 87-1 and F.S.§ 143-139.1: any person, firm or corporation that <br />undertakes to erect a modular building must have either a valid NC General Contractors <br />License or provide a $5,000 Sure Bond. <br />1500 s .ft. or Less - $100.00 <br />Building Permit Fee: <br />1501 - 2000 s q. ft - $130.00 <br />2001 s .ft. and U - $160.00 <br />MANUFACUTRED <br />HOMES <br />Manufactured Home Setup Fee only. Refer to Electrical, Plumbing and Plumbing <br />Fee Schedule for other permits. <br />Single-Wide <br />$30.00 each <br />louble-Wide <br />$45.00 each <br />Triple-Wide <br />$60.00 each <br />C <br />OTHER <br />RESIDENTIAL <br />CONSTRUCTION <br />Includes all Residential Additions. <br />Square Footage shall be used to calculate building permit fees. <br />Building Permit Fee: <br />Estimated Cost of Construction is determined at $65/sq.ft. for Heated Space, <br />$30/sq.ft. for Unheated Space and $15/sq.ft. for Unheated Porches, Shelters or <br />Decks. <br />Building permit fee shall be calculated by: $2.50 per $1,000 of Estimated Cost of <br />Construction (fronn calculation above). <br />Min mum Buildin Permit Fee is $40.00. <br />OTHER <br />RESIDENTIAL <br />Includes all Residential Renovations, Repairs, and Other Residential <br />CONSTRUCTION <br />Construction not listed elsewhere. <br />Permit Fee is Calculated based on Applicants Estimated Cost of Construction. <br />Building Permit Fee: <br />(Bid, quote, or estimate must be provided with permit application). <br />Building permit fee shall be calculated by: $2.50 per $1,000 of Applicants Estimated <br />Cost of Construction. <br />Minimum Building Permit Fee is $40.00. <br />