My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1978 - 03-20-78 Regular Meeting
public access
>
Clerk
>
MINUTES
>
1978
>
1978 - 03-20-78 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2009 2:32:52 PM
Creation date
10/15/2009 4:27:58 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
780 <br />WHEREAS, while a medical staff of 32 physicians could <br />support a 168 bed hospital, it has been concluded that the <br />total acute bed need of the hospital in 1979 is 137 beds based <br />upon service population and use rates and while this is fewer <br />than the present licensed total of 142 beds, the present <br />configuration of the inpatient units is inefficient and the <br />present facility contains 51 non-conforming beds and a signifi- <br />cantly higher utilization rate could be achieved if private rooms <br />are provided for most or all of the needed beds; and <br />WHEREAS, the BOARD OF TRUSTEES OF LEE COUNTY HOSPITAL, INC., <br />have concluded that the full utilization of the existing hospital <br />site within economic practicality would be extremely difficult <br />because of the restrictions due to terrain and that due to the <br />age of the facility and configuration of the structure that <br />newer concepts of hospital design facility cannot be adapted for <br />use; and <br />WHEREAS, the BOARD OF TRUSTEES OF LEE COUNTY HOSPITAL, INC., <br />have concluded that <br />building on a new s <br />acute care beds and <br />supporting services <br />for future hospital <br />staff needs: and <br />the best alternative is a new hospital <br />Lte to provide a facility which contains 137 <br />5 mental health beds with an ancillary and <br />base of 168 beds to provide the flexibilty <br />expansion to accommodate potential medical <br />WHEREAS, the study provided by the Board of Trustees' <br />consultants indicate that the estimated cost of such structure <br />would be $12,300,000.00; and <br />WHEREAS, the BOARD OF TRUSTEES OF LEE COUNTY HOSPITAL, INC., <br />hereby undertake to operate the current hospital facility and, <br />
The URL can be used to link to this page
Your browser does not support the video tag.