My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda - 2-6-14 Spec. Called Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2014
>
Agenda - 2-6-14 Spec. Called Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2014 11:32:15 AM
Creation date
2/5/2014 11:31:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oL <br />wr <br />THE February 4, 2014 <br />WOOTEN <br />C OMPANY Mr. John A. Crumpton <br />County Manager <br />ENGINEERING Lee County <br />P.O. Box 1968 <br />PLANNING Sanford North Carolina 2733 1 -1 968 <br />A R C H I T E C T U R E <br />Re: Recommendation for Award <br />Clyde Rhyne Drive - Roadway Extension - Contract 2 <br />Lee County, North Carolina <br />TWC No. 2793 -D <br />US EDA Project Number: 04 -01 -06546 <br />Dear Mr. Crumpton: <br />Enclosed are the Bid Tabulation and Bid Summary for the bids received on January 31, 2014 <br />for the above referenced project. There were a total of four (4) bids received for the project. <br />The apparent Low Bidder is FSC II, LLC d/b /a Fred Smith Company of Raleigh, NC with a <br />bid of $1,041,701.00. <br />The Low Bidder is properly licensed to perform the work based on the license information <br />obtained from the NC Licensing Board for General Contractors' web site and is prequalified <br />with the North Carolina Department of Transportation to perform they type of work specified <br />in the project. We are satisfied that Fred Smith Company is a qualified and responsible <br />contractor. <br />It is our understanding that the project budget is sufficient to cover the above construction <br />cost. Based on the project being within budget, we recommend that the County accept the bid <br />and award the Contract for the construction of the project to Fred Smith Company. The award <br />must be made contingent upon the concurrence of award by US Department of Commerce <br />Economic Development Administration (EDA). Please note that the project must be awarded <br />on or before April 1, 2014, without requesting an extension of the bid holding period from the <br />low bidder. <br />Enclosed also for your use are four (4) copies of the Notice of Award. Upon awarding the <br />contract, please execute this notice so that we may forward it along with the remaining <br />Contract Documents to the Contractor. In the meantime, should you have any questions <br />concerning this recommendation or need additional information please let us know. <br />Sincerely, <br />THE WOOTEN COMPANY <br />?0 Norfh Boylan Avenue <br />Raleigh NC 27603 -1423 <br />919.828.0531 Frederic D. Rash, E. <br />� fax 919.834.3589 1 Enclosures: As stated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.