My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Package 10-7-13 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2013
>
Agenda Package 10-7-13 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2013 7:43:43 AM
Creation date
10/2/2013 7:41:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2013 Annual Grant Award <br />Page 4 of 10 <br />(2) Utilize State of North Carolina and /or local procurement policies and procedures for the expenditure <br />of funds, and conform to applicable State and Federal law and the standards identified in the <br />Procurement Standards Sections of 44 Code of Federal Regulations (CFR) Part 13 and 2 CFR Part <br />215. Grantee must follow procurement procedures and policies as outlined in the applicable USDHS <br />and EMPG Program Funding Opportunity Announcement (FOA) and the USDHS and Financial <br />Management Guide. Grantee shall comply with all applicable laws, regulations and program <br />guidance. Grantee must comply with the most recent version of the funding Administrative <br />Requirements, Cost Principles, and Audit requirements. Administrative and procurement practices <br />must conform to applicable federal requirements. A non - exclusive list of regulations commonly <br />applicable to DHS grants are listed below, codified in the following guidance: 44 CFR Part 13; 2 <br />CFR 215; 2 CFR Parts 225, 220, and 230 (formerly OMB Circulars A -87, A21 and A -122); 15 CFR <br />Part 24; Federal Acquisition Regulations (FAR), Part 31.2; and OMB Circular A -133 °Aud(ts of <br />States, Local Governments, and Non - Profit Organizations" and 44 CFR Part 14; 28 CFR Part 23 <br />"Criminal Intelligence Systems Operating Policies "; 49 CFR Part 1520 "Sensitive Security <br />Information "; Public Law 107 -296, The Critical Infrastructure Act of 2002; Title VI of the Civil Rights <br />Act of 1964, as amended, 42 U.S.C. 2000 et. seq.; Title IX of the Education Amendments of 1972, <br />as amended, 20 U.S.C. 1681 et. seq; Section 504 of the Rehabilitation Act of 1973, as amended, 29 <br />U.S.C. 794; The Age Discrimination Act of 1975, as amended, 20 U.S.C. 5101 et. seq.; Cash <br />Management Improvement Act (CMIA) and its implementing regulations at 31 CFR Part 205; FEMA <br />Grant Programs Directorate, Grants Management Division, Match Guidance; Certifications and <br />Assurances regarding Lobbying 31 U.S.C. 1352, Drug -Free Workplace Act, as amended, 41 U.S.C. <br />701 et. seq. and Certification Regarding Drug -Free Workplace Requirements, Debarment and <br />Suspension Executive Orders 12549 and 12689 and 44 CFR Part 17 and Certification Regarding <br />Debarment, Suspension and Other Responsibility Matters; Assurances as listed in SF 4248 and SF <br />424D, 28 CFR Parts 66, 67, 69, 70 and 83; and Grant Award and Special Conditions documents. <br />(3) Grantee must take possession of all purchased equipment, receive any grant - eligible service and <br />complete Universal and up to six Optional work activities prior to seeking reimbursement from the <br />Grantor. <br />(4) Complete the procurement(s) process not later than September 30, 2014. <br />(5) Provide quarterly progress reports to the Area Coordinator and /or Branch Office by the following <br />dates: 31 December, 31 March, 30 June and 30 September. <br />(6) Provide a list at project completion phase to the Area Coordinator and /or Branch Office listing all <br />items completed through the grant. <br />(7) Comply with the applicable federal statutes, regulations, policies, guidelines and requirements, <br />reporting requirements and certifications as outlined in the applicable EMPG Program Funding <br />Opportunity Announcement (FOA) and Grant Award and Special Conditions documents. <br />(8) Maintain grant management filing system as required in Attachment A- <br />(9) Comply with current federal suspension and debarment regulations pursuant to OMB Circular A -133 <br />which states in pertinent part that "effective November 26, 2003, when a non - federal entity enters <br />into a covered transaction with an entity at a lower tier, the non - federal entity must verify that the <br />entity is not suspended or debarred or otherwise excluded. Grantee shall be responsible to ensure <br />that it has checked the federal System for Awards Management (SAM) <br />https: //www.sam.gov /portal /public/SAW and the State Debarred Vendors Listing, <br />http : / /www.pande.nagov /actions.asp to verify that contractors or sub - grantees have not been <br />suspended or debarred from doing business with the federal government ". <br />(10)Ensure that FY 2013 EMPG funds are not used to support the hiring of any personnel for the <br />purposes of fulfilling traditional public safety duties or to supplant traditional public safety positions <br />and responsibilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.